We’re growing to meet your stainless steel tubing needs even better!
We recently expanded our Denver-area facility to include an additional 14,000 square feet of floor space. The expansion has enabled us to increase our manufacturing capacity and significantly expand our Hot Shop, which features dedicated equipment for pilot manufacturing with lead times of as little as four weeks.
We now have additional space for materials and supply storage, and we’re creating a dedicated metallurgical lab to expand our materials testing and analysis capabilities.
The additional space plus some new equipment have added draw capacity, increased throughput, and enhanced our ability to take on large production orders, with lead times as fast as 10-14 weeks.
Contact us to discuss your stainless steel tubing needs. We can help you select the right material and specifications and develop the optimal draw schedule for your application.